bluffcitybuildings.com · Memphis & Mid-South
Turnkey concrete and steel buildings.
It starts with a chalk line. One Mid-South crew pours the concrete slab and erects the steel. Choose Tubular Steel or Commercial Red-Iron below.








bluffcitybuildings.com · Memphis & Mid-South
It starts with a chalk line. One Mid-South crew pours the concrete slab and erects the steel. Choose Tubular Steel or Commercial Red-Iron below.
Step 2: Forms and rebar
Rebar sits on chairs over a continuous vapor barrier, perimeter edges get a thickened footing, and red-iron projects set cast-in-place anchor bolt templates before concrete arrives.
Step 3: The pour
The same crew places, screeds, and finishes your 3,500 to 4,000 PSI concrete floor, saw cuts control joints, and cures the slab before steel erection begins.
Step 4: Anchored steel
Tube-frame base rails anchor tight into cured concrete, while commercial red-iron columns bolt onto leveling nuts and grouted base plates so structural loads bear straight into the slab.
Step 5: Clear-span framing
Clear-span trusses on tube-frame builds and bolted knee-haunch rigid frames on red-iron builds span the entire floor with zero interior posts blocking your lift, boat, or fleet.
Step 6: Purlins and bracing
Hat channel purlins, girts, and wind bracing tie every bay together square so your building shrugs off Mid-South storms.
Step 7: Roof and walls
Painted steel roof and wall panels fasten with neoprene sealing-washer screws, finished off with ridge cap, rake trim, and drip flashing.
Step 8: Doors and handover
One price covering concrete and building, one schedule, one crew to call. Roll the door up and move in your truck, lift, boat, or business.
Three standard turnkey sizes
Across Memphis, Shelby County, DeSoto County (Southaven, Olive Branch, Hernando), Tipton, Fayette, North Mississippi, and Eastern Arkansas, Bluff City Buildings pours the concrete slab and erects the steel with one crew: Tier 1 Standard Tube-Frame packages plan around 20x30 (~$25k), 30x30 (~$30k), and 40x30 (~$35k), while Tier 2 Commercial Red-Iron rigid frames (30x40 to 50x80+) are custom quoted to your site.

30 x 30 ft · 900 sq ft · ~$30k
Estimated turnkey price (concrete + building)
~$30k
A planning estimate for concrete and building, not a binding quote. Final price depends on lot grade, eave height, slab thickness, and doors.
| Building size | Floor area | Concrete + building estimate | Standard doors | Best fit | Spec sheet |
|---|---|---|---|---|---|
| 20 x 30 ft | 600 sq ft | ~$25k | One 10x8 roll-up door and one 3x7 steel walk door | Two-car garage or a tidy workshop | View 20x30 |
| 30 x 30 ft | 900 sq ft | ~$30k | One 10x10 roll-up door and one 3x7 steel walk door | Shop with room for a lift and a bench | View 30x30 |
| 40 x 30 ft | 1,200 sq ft | ~$35k | Two 10x10 roll-up doors and one 3x7 steel walk door | Shop plus a bay for equipment or a boat | View 40x30 |
Two transparent structural tiers
Tier 1 · Standard Turnkey
20x30 ~$25k · 30x30 ~$30k · 40x30 ~$35k
Certified galvanized tubular steel erected on our reinforced 4-inch monolithic concrete slab. Best value for residential garages, backyard lift shops, and boat or equipment storage.
Tier 2 · Commercial Duty
Preliminary estimate by size · Site-verified quote
Heavy welded red-oxide tapered I-beam rigid frames bolted to cast-in-place anchor bolts and engineered commercial slabs. Select your footprint in our 3D Designer or quote form for a preliminary estimate (excludes MEP).
Concrete slab
4 in · 3,500 PSI
Monolithic thickened-edge footing, #4 rebar grid, 6-mil vapor barrier, saw-cut joints. 6 in lift slabs available.
Steel framing
Certified galvanized
Engineered 14-ga (or heavy 12-ga) tubular steel frame anchored cleanly to your cured concrete slab.
Single crew
1 schedule · 1 quote
No waiting between a separate concrete outfit and a building erector. One crew owns slab alignment and handover.
Regional focus
Memphis & Mid-South
Built for Shelby, Tipton, Fayette, DeSoto, North Mississippi, and Eastern Arkansas clay soils and storm loads.
3D Building Designer & Live Estimator
Pick your size, concrete slab thickness, roof style, colors, doors, windows, and lean-to. The planning estimate updates live for concrete and building.
Loading interactive 3D view
30 x 30 ft · 12 ft eaves · 4 in slab
Drag to rotate. Scroll or pinch to zoom. Switch to Daylight colors to check paint tones closely.
Turnkey planning estimate (concrete + building)
~$30k
Range: $28,500 to $32,000 · Est. from $390/mo
Included in one turnkey scope
Turnkey planning estimate for concrete and building, not a binding quote. Excludes applicable sales tax, local permit fees, heavy tree clearing, and unusual slope or utility work. Pricing reviewed November 27, 2026.
Your building spec
Tier 1 Standard Tube-Frame · 30 x 30 ft (900 sq ft), Vertical roof, 12 ft eaves, sides enclosed, ends enclosed. Roof Galvalume, walls Charcoal, trim White. Specs: 4 in standard slab, 14-ga frame. Doors: 10x10 roll-up (front end), 3x7 walk-in (left side).
The usual way
Bluff City Buildings
Clear, grade, and square a compacted gravel pad on your lot.
Forms, vapor barrier, #4 rebar, thickened edge, and saw-cut finish.
Certified framing, panels, trim, and doors anchored on the slab we poured.
One crew, one calendar, one number to call from stake to handover.
Where we build
Memphis & Shelby County
Memphis, Arlington, Collierville, Bartlett, Millington, Lakeland, Germantown
View TN details
DeSoto County
Southaven, Olive Branch, Hernando, Horn Lake, Walls, Nesbit
View MS details
Tipton County
Covington, Atoka, Munford, Brighton, Drummonds, Mason
View TN details
Fayette County
Oakland, Somerville, Piperton, Rossville, Moscow, Gallaway
View TN details
North Mississippi
Marshall, Tate, and Panola Counties (Byhalia, Senatobia, Holly Springs, Coldwater)
View MS details
Eastern Arkansas
Crittenden County and nearby Delta lots (Marion, West Memphis, Earle, Proctor)
View AR details
Straight answers
Our three standard Tier 1 tube-frame turnkey packages include basic site prep, a 4-inch reinforced concrete slab, certified galvanized steel building, and standard doors: 20x30 (600 sq ft) plans around ~$25k ($24,000 to $26,500), 30x30 (900 sq ft) plans around ~$30k ($28,500 to $32,000), and 40x30 (1,200 sq ft) plans around ~$35k ($33,500 to $37,000), before taxes, permits, or unusual site clearing. Tier 2 commercial red-iron buildings are custom quoted to site and engineering requirements.
Every standard turnkey package covers pad layout and light grading, compacted stone base, 6-mil vapor barrier, #4 rebar-reinforced thickened-edge concrete slab, curing time, certified steel building framing, roof and wall panels, full trim, and standard roll-up plus walk-in doors installed by one coordinated crew. Taxes, local permit fees, heavy tree clearing, and electrical/plumbing are quoted separately.
When you hire two separate contractors, delays between the pour and erection leave you coordinating schedules, and any slab-dimension or anchor-clearance mistake turns into finger-pointing. With one crew, the exact team pouring your slab erects your steel building.
Standard Tier 1 shop slabs are 4 inches thick using 3,500 PSI concrete over a compacted gravel base and 6-mil moisture vapor barrier, reinforced with #4 rebar and a monolithic thickened edge footing with saw-cut control joints. For heavy equipment or automotive lifts, we pour project-specific 6-inch slabs or thickened 4,000 PSI lift pads matched to your equipment specifications.
Most residential two-post lifts require at least 12-foot eaves (14 feet for tall trucks or asymmetric commercial lifts), but exact slab thickness, minimum concrete PSI, anchor embedment, and cure time are set by your specific lift manufacturer manual (typically 4.25 in to 6 in minimum of 3,000 to 4,000 PSI concrete, cured 28 days before anchoring). Share your lift model before we pour so we thicken the exact post footprint.
For Mid-South storms, leaves, and heavy rain, we recommend a Vertical roof. Vertical panels run from ridge to eave over additional framing purlins so water and debris shed cleanly instead of catching on horizontal ribs.
Free site & lot estimate
Monday through Saturday, 7:00 AM to 6:00 PM CT · Pricing reviewed November 27, 2026